Industrial Roof in Metamorfosi

   

 

Project location: Metamorfosi Attica
Project type: Roof, Industrial
Power: 71.91 kWp
Completion Date: 31/10/2011
P/V modules: Exel Group, ESP Series 60 Poly 235
Inverters: ABB, PVS 300 8 kW single phase
Mounting structure: Diktyo Aloyminioy "ALNETCO"
Module tilt | Azimuth: 20°/0°

 

The project involves an industrial roof in Metamorfosi. This is a complex of three different roofs in NorthEast - SouthWest orientation, of total area 2.000 sq. m.
The installed photovoltaic system has a total capacity of 71,91 KWp, consisting of 306, 235 W modules by Exel Group (ESP series 60 Poly 235), tilted at 20°, placed in the different roofs as follows:
• 170 frames were placed in 15 rows and triple landscape order in the first roof,
• 51 frames were placed in 4 rows and double portrait order in the second roof, and

• 85 frames were placed in 5 rows and double portrait order in the third roof.
The inverters used are by ABB (PVS 300 8 KW single phase).
The mounting system is by Diktyo Aloyminioy "ALNETCO" company.

The project was completed on 02/11/2011. The estimated production of the system amounts to 95.784 KWhrs yearly.